Two Power Plant Boilers and Ducts Insulation, Bulgaria
for Alstom
Client:
G+H Isolierung
Project Specification: Hot Insulation

During one year 120.000 m² insulation have been installed with a maximum manpower up to 450 workers.
Due to short installation time of one year a good coordination between other disciplines and client and insulation works was required.
Material supply and procurement coordination was a challenge for the short installation time, three to four trucks with several materials needed to be unloaded per day and the material to be dispatched to the areas of application.

Back to Projects


Two boilers with ducts


Raw gas duct


Insulation under progress


Duct


Downcommers


Piping


Piping