Peak Shaving LNG Terminal, Netherlands for Gasunie Client: Gasunie Project Specification: CINI and Client specific Specifications
During mayor shut down the complete terminal was overhauled and general quality control was required. As short summary, but not limited to, reflects the range of activities to be surveyed by QC: - Painting and fire protection of steel structures and tanks - Concrete refurbishment - Ground works - Civil works - Cryogenic insulation - Piping works - Cleaning and repair of seawater pumps - Steel works - Works related to E/I - Cold box repair and perliting - Cryogenic testing of valves - Heating, ventilation, air conditioning and refrigeration works (HVACR)
The complete documentation needed to be defined and collected to filing system.